The main projects, in which Mr. Alessandro Manunza has performed the described activities, before and after funding M2EC, are summarised here below:

Year

Site

Activities

2012

Campagna (Italy)

20 MW Wind Farm: calculation of overvoltages induced in cable sheaths.

2012

Bonefro (Italy)

8 MW Wind Farm: calculation of overvoltages induced in cable sheaths.

2012

Ruwais (UAE)

Ship loaders: load flow, power factor correction and harmonic analysis.

2011

Isola di Capo Rizzuto (Italy)

70 MW Wind Farm: load flow, short circuit and protection setting of HV and MV relays.

2011

Portoscuso (Italy)

290 MVA power plant: load flow, short circuit, motor starting, transformer sizing.

2011

Bolzano (Italy)

Steel rod factory: short circuit and protection settings of HV and MV relays.

2011

Puente Nuevo (Spain)

390 MVA thermal power plant: Fault analysis and solution proposal.

2011

Colleferro (Italy)

54 MW combined cycle power plant: load flow, short circuit, protection setting of HV and MV relays.

2011

Alrar (Algeria)

HV substation: protection setting.

2011

Gibe (Ethiopia)

66 kV OHL: calculation of electrical parameters.

2010

Castelmassa (Italy)

57 MW CC power plant: load flow, short circuit, transient stability.

2010

Crescentino (Italy)

12 MW Renewable Energy power plant: load flow, short circuit, transient stability.

2010

Alrar (Algeria)

66 kV Substation: protection setting.

2010

Agiba (Egypt)

100 kW Photovoltaic Power Plant: feasibility study of an isolated grid whose sources are a photovoltaic field and some diesel generators.

2010

Zubair (Iraq)

Oil Field Development Project, 100 MVA DGS: load flow, short circuit, motor starting, harmonic analysis.

2010

Marcinelle
(Belgium)

408 MW power plant: harmonic analysis.

2010

Ferrera Erbogn. (Italy)

ENI Green Data Center: insulation coordination.

2010

Castaic (USA)

1500 MW hydro power plant: calculation of transient recovery voltage (TRV).

2010

Marcinelle
(Belgium)

408 MW power plant: update of small signal stability, transient stability.

2010

Bolgiano (Italy)

Enipower power plant: short circuit, protection and measurement single line diagrams.

2010

Ferrera Erbognone (Italy)

ENI Green Data Center: insulation coordination. In progress.

2010

Algesiras (Spain)

800 MW Algesiras Power Plant: tuning parameters of generators AVR and PSS. In progress.

2009

Menzel Ledjmet East (Algeria)

Menzel Ledjmet East Project: Load Flow, short circuit and electromechanical transients. In progress.

2009

Pisa
(Italy)

3.3 MW Photovoltaic Power Plant: BOS calculation, general technical specification, load flow, cable sizing.

2009

Mellitah (Libia)

2 MW Photovoltaic Power Plant: feasibility study of an isolated grid whose sources are a photovoltaic field and some diesel generators.

2009

San Gregorio Magno (Italy)

50 MW Wind Farm: load flow, short circuit, protection setting of HV and MV relays, VT and CT sizing.

2009

Mazara del Vallo
(Italy)

Wind Farm: insulation coordination study (switching overvoltages).

2009

Campofelice
(Italy)

Wind Farm: insulation coordination study (switching overvoltages).

2009

Alessandria
(Italy)

Michelin plant: load flow, short circuit and protection setting

2009

Isola di Capo Rizzuto (Italy)

94 MW Wind Farm: load flow, short circuit and protection setting of HV and MV relays.

2009

El Feel
(Libya)

Oil extraction field: Load flow, short circuit and protection setting of HV and MV relays.

2009

Caccamo
(Italy)

18.5 MW windfarm: load flow, short circuit and protection setting of HV and MV relays.

2009

Alia e Sclafani
(Italy)

25.5 MW windfarm: short circuit and protection setting of HV and MV relays.

2008

Qatar

Qatar Fertiliser Company – CT sizing.

2008

Puente Nuevo (Spain)

330MW power plant – Load Flow, LV protection setting, VT and CT sizing.

2008

Isola di Capo Rizzuto (Italy)

40 MW Wind Farm: short circuit and protection setting.

2008

Qurrayah
(Saudi Arabia)

Qurrayah Sea Water Plant: insulation coordination study (lightning and switching overvoltages).

2008

S. Gregorio M.
(Italy)

40 MW Wind Farm: short circuit, VT and CT sizing, protection setting.

2008

Osoppo
(Italy)

Ferriere Nord: protection setting.

2008

Melfi
(Italy)

80 MW combined cycle: transient stability

2008

Sermide
(Italy)

1150 MW power plant: Load Flow, short circuit and protection setting of MV relays.

2008

Livorno
(Italy)

FSRU Livorno Project: load flow, short circuit, motor starting, transient stability.

2008

Atexcaco (Mexico)

30.5 MW Hydro power plant: grounding grid sizing, load flow, short circuit and protection setting.

2008

Marcinelle
(Belgium)

408 MW power plant: small signal stability, transient stability.

2007-2008

Giammoro
(Italy)

Duferdofin steelworks: short circuit and protection setting

2007-2008

Riva del Garda
(Italy)

80 MW combined cycle: transient stability

2007-2008

Turkey

ENI - Trans Anatolian Pipeline: protection and measuring single line diagrams, Load Flow, short circuit, motor starting, harmonic analysis, transient stability.

2007

Belgium

Esso Antwerp Refinery: short circuit and protection setting for 11 substations

2007

Torino Stura
(Italy)

Michelin plant: load flow, short circuit and protection setting

2007

Switzerland

ABB CH: translation of two manuals of “800xA System”

2007

Egypt

Gasco Ruwais: setting files to be downloaded into digital protections

2007

Sannazzaro d. B.
(Italy)

Isocraker and related facilities: protection coordination

2006

Brindisi
(Italy)

Polimeri Europa industrial plant: protection setting

2006

Port Harcourt
(Nigeria)

Obama flowstation of NAOC: protection setting

2006

Nerviano
(Italy)

Pharmacia, industrial plant of Nerviano: load flow, short circuit, protection setting.

2006

Roma
(Italy)

Nuova fiera di Roma: protection setting

2006

Simeri Crichi
(Italy)

800 MW power plant: CT validation, protection setting at HV, MV and LV levels.

2006

Magisano
(Italy)

HV substation: CT validation.

2006

Porto Tolle
(Italy)

Enel power plant: grounding grid sizing

2006

Rozzano
(Italy)

Istituto Clinica Humanitas: protection setting

2005

Ras Laffan
(Qatar)

800 MW power plant: bus bar change over simulations, fault analysis

2005

Ivana
(Croatia)

Offshore platform: Load flow, short circuit, transient stability studies

2005

Buhasa
(Saudi Arabia)

Steel rod factory: CTs validation, isolation coordination

2005

S. Barbara
(Italy)

380 MW power plant: Load flow, short circuit, Grounding grid sizing, On Load Tap changer sizing, transient stability studies, bus bar change over simulations

2004-2005

Hadeed
(Saudi Arabia)

Steel rod factory: setting and selectivity of more than 500 protections

2004

Kashagan
(Kazakhstan)

Offshore platform: Load flow, short circuit

2004

Ostiglia
(Italy)

1500 MW power plant: Load flow, short circuit, Grounding grid sizing, On Load Tap changer sizing, setting of protections of generator and HV substation, transient stability studies, bus bar change over simulations

2003-2005

Chivasso
(Italy)

1150 MW power plant: Load flow, short circuit, Grounding grid sizing, On Load Tap changer sizing, setting of protections of generator and HV substation, transient stability studies, bus bar change over simulations

2003-2005

Yambu
(Saudi Arabia)

16 MW power plant: Load flow, short circuit, bus bar change over simulations

2003

Sermide
(Italy)

1150 MW power plant: Load flow, short circuit, Grounding grid sizing, On Load Tap changer sizing, setting of protections of generator and HV substation

2002-2004

Barka
(Oman)

530 MW power plant: Load flow, short circuit, Grounding grid sizing, bus bar change over simulations

2002

Pietrafitta
(Italy)

380 MW power plant: Grounding grid sizing

2001

Cassano
(Italy)

380 MW power plant: Load flow, short circuit

2001

Cutro
(Italy)

16 MW power plant: Grounding grid sizing

2000

Ballylumford
(EIRE)

650 MW power plant: On Load Tap changer sizing

1999-2001

Castleford
(UK)

100 MW power plant:  On Load Tap changer sizing, Load Flow, short circuit

All Rights Reserved 2003. http://m2ec.manunza.com Design by LM